Switchgear Inspection and Verification
Complete inspection of MV/LV distribution boards including connection verification, insulation checks, and conformance to design specifications.
Our engagements span the full data center project lifecycle, from initial inspection through final pre-energization validation.
Complete inspection of MV/LV distribution boards including connection verification, insulation checks, and conformance to design specifications.
Primary and secondary connection checks, grounding verification, thermal inspection, and manufacturer documentation validation.
Automatic transfer switch automation verification, pre-energization functional testing, and full system documentation.
Review and validation of Site Inspection Plans and Inspection and Test Plans to ensure every point is documented, inspected, and approved.
Preparation and completion of Pre-Energization Inspection forms with exhaustive documentation before any system is energized.
Systematic punch list management from initial non-conformance identification through fully documented and validated closure.
Verification of medium and low voltage cable routes for conformance to plans, separation distances, and electrical safety standards.
Point-by-point bend radius inspection for fiber optic, copper, and power cables against manufacturer specs and NEC requirements.
Complete inspection of grounding and equipotential bonding systems to ensure electrical safety and compliance.